Photo Gallery for '5637 Boiler Lift'

Following the damage believed to be sustained during a routine off loading, the boiler had to be lifted out of the frames to get at some ofthe hard to access stays. The work, carried out under the direction of ESR Locomotive Superintendent was completed and the loco passed its hydraulic and steam tests in early February. This gallery shows the craning in of the boiler and lifting of the side tanks on the 7 February